Cases – Oil
Oil
See all our Oil Cases
Chemical
See all our Chemical Cases
Mechanical
See all our Mechanical Cases
Wind
See all our Wind Cases
Consultancy
See all our Consultancy Cases
Reactivation of Downhole Chemical Injection Control Line in 12 hours
..
Replaving Valves. Using Add On Gate Valve Tool
..
Removal of bacterial varnish in hydraulic wellhead system
.
Avoid Production Loss by Decontaminating Lube Oil Systems Online
.
Avoid Production Losses During Varnish Elimination
.
Complete Turbine Decontamination Within 10 Hours
.
Decontaminate lube oil systems online & avoid production loss
.
Varnish potential reduction in large lube oil systems
.
Reactivating cold wells
.
Wellhead online flushing
.
Turbulent conventional oilflushing of hydraulic top drive
.
Clean Sealing Fluid increases MTBF in Barrier Seal Systems
.
Online flushing in Norway - do you need to flush?
.
Sharing Best Practice in Control Line Cleanliness
.
Lube oil flushing of 48 systems onshore - Barzan
.
Pearl GTL lube oil flushing
.
TRSSSV Control Line Unblocking
.
Unblocking Chemical Injection Line
.
2nd Generation SCCO2
.
Control Line Flushing
.
Reduced Risk of Production Losses due to Blockages
.
Setting Industry Standards
.
Nybro Gas Treatment Plant (UK)
.
Flushing Of Umbilical
.