ATEX Pump unit 375
Features
- Pressure regulator in stainless SS316 steel (PRV)
- Integrated flow meter for reading the actual pumping quantity
- Water cooler
- Mounted an framed in stainless SS316 Steel
- Articulated wheels mounted for site mobility.
- Forklift facility
Safety features
- Stainless SS316 steel drip trays fitted as standard
- Gauges for pressure control
- Sealed and calibrated safety valve
- Marking CE-Ex II 3G IIB T3
- ATEX marking: 3G II T3/ ZONE 2
Capacity & performance
Type of fluid | Water |
Max flow rating | 103 l/min |
Max pressure | 105 bar |
Tank capacity | 300 liters |
Max temperature | 70°C |
Connections in/outlet | ½” BSP 60° |
Filter element | 5μ / 20” |
Weight & dimensions
Length | 1445 mm |
Width | 850 mm |
Height | 1775 mm |
Gross Weight | 675 kg |
The unit is driven by a 400V, 22kW, 50Hz, EXd electrical motor, fitted to a high-pressure triplex piston pump.
The unit is fitted with a 300l. stainless steel tank intergraded with temperature-switch and low level-switch.
The unit can be used in all pipe systems from ½” and upwards, and can handle a very wide temperature and pressure range using the integrated pressure regulator and water cooler.
Organic & inorganic contamination
De-scaling of calcium carbonates
Chemical cleaning of plate heat exchangers
Gas Compressors offshore
Online descaling reduces cleaning time
Saving with chemical cleaning
Chemical cleaning of cooling systems
From fire-fighting to pro-active maintenance
Dependency of a functional toilet system
Cleaning of offshore heat exchanger
Chemical cleaning of oil coolers in the nacelle
De-scaling of calcium carbonates
Chemical cleaning of plate heat exchangers
Gas Compressors offshore
Online descaling reduces cleaning time
Saving with chemical cleaning
Chemical cleaning of cooling systems
From fire-fighting to pro-active maintenance
Dependency of a functional toilet system
Cleaning of offshore heat exchanger
Chemical cleaning of oil coolers in the nacelle
Rental per day*
€ 149,00
*Please ask for a quotation on long term rentals.
Accessories and consumption materials should be expected.
Free consultation
Contact us for a free 30 minute consultation, about your requirements and a solution.